Guelph, Ontario — Guelph's south end is about to get the recreation hub it has been waiting on for years. The City of Guelph has confirmed its new South End Community Centre, at 25 Poppy Drive West, opens on Friday, November 27, 2026 — with an official opening ceremony from 3 to 4 p.m., an open house running to 7:30 p.m., and a full opening weekend of free programming.
The building is 160,000 square feet, and the feature list is the full municipal wish list in one address: twin ice pads, a double gymnasium, a 25-metre eight-lane pool alongside a leisure pool, an indoor walking track, and meeting rooms and flexible community spaces. The opening weekend — November 27 to 29 — offers free swimming, skating and gymnasium programming with no advance registration, on a first-come, first-served basis. Drop-in programming runs through December, and full programming and rentals begin in January 2027.
The centre carries a $121 million construction budget, funded 87 per cent by development charges, 8 per cent by grants — including the Province of Ontario's Community Sport and Recreation Infrastructure Fund — and 5 per cent by tax-supported funding. It is also the first City of Guelph facility designed to the Canadian Green Building Council's Zero Carbon Building Design Standard, built to use more than 60 per cent less energy than a conventional facility, with heat pumps, rooftop solar, heat recovery, an electric ice resurfacer and EV charging.
City leaders marked the announcement in the city's own terms: Chief Administrative Officer Tara Baker spoke for the administration, Cam Guthrie — identified by the city as former mayor — and Leanne Caron, identified as mayor-elect, both appear in the city's release. (File photo: an aerial view of downtown Guelph; no licensed photograph of the new centre itself was available.)
Why it matters: Guelph's south end has grown for years without a full-service recreation centre of its own, and residents have driven across the city for ice time, lane swims and gym space. A 160,000-square-foot centre with twin pads and two pools changes the daily geography of the neighbourhood — and its zero-carbon design makes it a test of whether the next generation of Canadian community buildings can be both bigger and far lighter on energy.
Sources: City of Guelph news release, November 13, 2026 (primary — the Friday, November 27 opening, the 3 to 4 p.m. ceremony and open house, the free opening weekend, the $121 million budget and funding split, and the zero-carbon design standard); City of Guelph South End Community Centre facility page (the 25 Poppy Drive West address, 160,000 square feet, the feature list and regular hours); Madison Melo, November 13, 2026 (second origin — the same opening facts).
